May 2020
New project: Installation of a 1.37MWp photovoltaic system

SCE S.à r.l. has been awarded the contract for the installation of a 1.37 MWp photovoltaic system on the roofs of De Verband in Colmar-Berg.
The project covers the delivery, installation and commissioning of:
We sincerely thank our client De Verband for the great trust placed in us to build this photovoltaic plant.
- 4,162 solar modules at 330 W each
- 17 inverters
- 43 kilometers of cable
- 1 kilometer of cable trays
- Modifications to existing medium-voltage systems
- Modifications to existing low-voltage systems
- Various AC and DC electrical distributions
